Skip to content

Olympic Arena Power Grid

Temporary Substation & Distribution for Global Sporting Events

Technical Description: Designed to support the massive broadcasting and lighting requirements of a major international stadium event, this project utilized mobile substations to bypass traditional generator dependency. By stepping down high-voltage utility power to 120/208V, the system provided 5,000A of clean, silent electricity. The configuration included over 10,000 feet of cam-lok cabling and custom distribution panels to power UHD broadcast trucks, LED pitch lighting, and VIP hospitality suites without the carbon footprint of diesel fuel.

Back To Top